Product Description
SBR Buffings/Base Shredded Rubber - 50Lb Bag
BULK SAVINGS!!! Minimum Quantity of 4 Required.
For use as base layer with Poured In Place EPDM Granular Rubber. Minimum quantity required is four.
Click on the link in "Bulk Pricing" above to see the incredible bulk discounts.
- Buy 5 - 10 and get 10% off
- Buy 11 - 20 and get 20% off
- Buy 21 or above and get 30% off
Poured In Place Surface Materials Calculator
PIP Cheat Sheet
- It is recommended that you order 5%-10% overage on rubber and glue. This will allow for unlevel site conditions, possible wavy subgrade variances, workmanship, and priming of subgrade.
- A “Base” Primer may be desirable using a mixture of 50% Binder/50% Acetone. On edges and around posts where extra adhesion may be necessary, a more aggressive “Edge” Primer ratio of 80% Binder/20% Acetone can be used.
- PIP cannot be installed on dirt and requires a sub-base of concrete, asphalt, or properly compacted stone/gravel. As PIP is porous, proper drainage is essential.
- It is the customer’s responsibility to determine the required fall height of any/all existing or future playground equipment.
- The Mixing and Installation of PIP Surfacing should be performed by a professional or an experienced technician.
- PIP should be installed at proper depths to meet current ASTM/HIC (Head Injury Criteria) standards. Customer is responsible for determining fall heights of playground equipment and all project fall height requirements.
- Discount Playground Supply HIGHLY recommends having your completed surface 3rd Party tested for Head Injury Criteria and compliance for your required fall height
WARNING: Cancer and Reproductive Harm - www.P65Warnings.ca.gov
Product Videos
Custom Field
Bulk Discount Badge Bulk Savings